project brief
This massive 5 storey building required a steel deck installer capable of meeting the complex logistics and hoisting challenges as well the aggressive design build schedule. Metala-con rose to the challenge executing safely and on schedule.
Completion
2022
General Contractor
Ledcor
Scope
Pre-painted steel deck - 2,900,000sf